The only puzzle is the placement for the nutserts for the mizzen sprit on the purchased spar section. The mizzen nutserts are sitting almost a foot higher than on the mark indicated on the plans. I hope to figure out if this is a modification from the plans, or if I need to put Nutserts at the plan lines.
The main mast looks great. I will add the stop collars to each section tomorrow, and then glue them all up this week after doing careful alignement.



5-25-15
I put the stop collars on yesterday, and confirmed that the snotter placement on the mizzen is correct.  New sheet had error on that line, old sheet was correct.  





June 9 - update,  fiberglass mast track wedges
Each section needs to transition smoothly from diameter to diameter.  I used Alan Stewarts method for making fiberglass wedges for the sail track.  I also applied a little filler over the mast collars and sanded so as to blend in with the ramps.  This was not a difficult job to do.  
- cut 3" fiberglass tape in half to make 1.5" strips
 - cut 14" length, then 13", 12", 11", 10.
 - place on a piece of plywood covered in packing tape and epoxy up the wedge.
 - apply packing tape to each diameter section of the mast at least 6" longer than the wedge
 - move wedge to mast and press in place.
 - After it sets, remove from mast, clean up, and cut in half to make two wedges from each strip
 - Clean up packing tape and masts with a quick wipe of acetone.
 - place in place, epoxy, and fair in place.
 
![]()  | 
| Fiberglass mast track wedge epoxied in place. | 
![]()  | 
| Photo distorts, but it really is a straight line in the transitions. | 
![]()  | 
| filler over the collar transitions to the fiberglass ramp. | 
June 9, 2015 - rivets
I have decided to join the sail track to the masts with stainless steel 5/32" rivets with stainless mandrels.  To isolate from the aluminum mast, I am applying anti-sieze lubricant, and plan to epoxy  coat the mast and paint it prior to installing the track.  
June 18 - assembly - mast tracks
Attaching the stainless track to the mast is a chore as I do not have a long handled rivet gun.  Setting stainless steel rivets involves strength and determination as well as careful alignment of the tracks.  
I go the rivets from FAstenal,  great selection, price, and service.  I have a pile of 5/32nd stainless rivets with stainless mandrels,  I am using some plastic tubing (wands from shop vac) as handle extensions to get enough leverage to set the rivet.  Every now and then a mandrel falls into the mast, or the mandrel breaks off at the wrong point and rivet removal becomes necessary.  I broke one drill bit already.  Proud to report that both sails move smoothly along the track!  
![]()  | 
| Just because I could. | 
![]()  | 
| test of track. The joint needs to be very level to avoid binding. A few short raps with a hardwood block worked. The ends did not need to meet exactly at 90 degrees as the plane of the rails had more effect than lateral alignment on smooth operation. | 





0 komentar:
Posting Komentar